Free · Instant · No obligation
Pick your service, enter square footage, and see your range instantly. Then lock the price with a refundable deposit — no waiting for a callback.
■ Calculator
Standard lead time is 2–4 weeks. Rush projects mobilize within 5 business days.
■ Estimated range
—
—
Ballpark based on Atlanta commercial market rates. Actual cost depends on subfloor condition, access, phasing, and spec.
Get this in writing + a same-day callback
We'll email your estimate range with Christopher's direct contact.
| Service | Atlanta rate | What drives cost |
|---|---|---|
| Epoxy flooring | $4–$9/sqft | Coating type (thin-set vs. broadcast), slab prep, mil thickness |
| Polished concrete | $5–$12/sqft | Grit level, densifier, guard coat, existing coatings to remove |
| Urethane mortar | $8–$14/sqft | Drain details, thermal cycling spec, aggregate broadcast |
| Interior painting | $1.50–$3.50/sqft | Ceiling height, number of coats, patch/drywall scope |
| Exterior painting | $2.50–$5.00/sqft | Surface material (CMU, stucco, EIFS), lift access, primer + coats |
| Multi-service | $4–$10/sqft | Combined flooring + painting scope; blended mobilization discount |
The estimate covers direct installation labor and materials. It does not include:
■ Recent Atlanta commercial work
■ Common questions
Commercial pricing is driven by variables we can't assess from a ZIP code and square footage: subfloor condition, moisture readings, access constraints, phasing requirements, and finish spec. A range tells you whether a project is a $25K job or a $250K job — that's the useful signal. A false single number just creates renegotiation friction later. Christopher gives you the firm number on-site after a 15-minute visit.
The mobilization deposit holds your spot on the schedule and covers material procurement lead time. It's 100% credited toward your final invoice — not a fee. If we can't agree on scope within 14 days of deposit, it's fully refunded. No exceptions.
After a free 15-minute site walkthrough. Christopher takes measurements, checks subfloor or wall conditions, and hands you a written line-item quote within 24 hours of the visit. Most projects get awarded same-week — no weeks-long bid process.
Rush applies when you need mobilization within 5 business days. The 20% premium covers expedited material sourcing, overtime crew scheduling, and compressed pre-job prep. Standard lead time is 2–4 weeks from deposit.
FloorForge is based in Atlanta and serves the metro. We've completed projects in Charlotte, Savannah, Nashville, and Birmingham — typically for GC clients managing multi-site programs. For out-of-market work, travel and per-diem are added to the quote. The Atlanta-area check on the estimator is just a heads-up, not a disqualifier.